Gatwick Airport Radar Tower avoids Christmas 2013 River Mole Flood

Gatwick Airport Radar Tower avoids Christmas 2013 River Mole Flood

The floods at Gatwick Airport around Christmas 2013 in relation to the River Mole caused considerable disruption when an electrical substation flooded. Such disruption to key infrastructure is completely unnecessary if competent Civil Engineering Consultants are employed to assess sites and produce appropriate flood mitigation solutions. At Wilsham Consulting our Engineers have experience of flood mitigation design for a wide range of clients, from domestic sites to key infrastructure. A good example of this is the NATS Gatwick Airport Radar...

read more

Flood Mitigation and Flood Defence

Flood Mitigation and Flood Defence

Many of our clients have experienced some form of flooding. Often they will have experienced considerable damage to their property and contents. Some after making a claim in relation to flood damage on their household insurance, are left uninsured in the future. It is therefore critical that they do anything reasonably possible to reduce their risk of future damage. We would usually always visit site to understand the problem. This is combined with our extensive experience of the various forms of flood damage. Flood damage can take the the...

read more