External Works Design
We have specialist experience of designing external works outside some of the most famous locations in the UK.
read moreTimbmet
Wilsham Consulting Director – Stephen Gibson was responsible for the detailed design of road and sustainable drainage works for Timbmet's headquarters, near Oxford. A balance bond and soakaway system were designed at the Timbmet site to maximise discharge to groundwater and reduce flooding. Flooding was common on Cumnor Hill and within the Timbmet site. It was thefore critical that the design sustainably treated and retarded surface water flows to below greenfield rates. An innovative balancing pond was designed with...
read moreThe Heritage Way, Gosport
The Hertage Way is now an important road into this side of Gosport. In highway engineering terms it was very challenging. During the initial stages of construction the whole area was flooded, contamined and constuction had ground to a halt. The entire development of the new housing estates depended on the road being built on time. I was brought in by the developer and his contractor to fundamentally review how the road could be built. Instead of the mass importing of capping material I proposed and agreed with the contractor a...
read more




